QC guide

Icon description

Purpose

Period

Incoming QC

IQC

the coil inspection of surface/rust/diameter

• Every time when uploading coil rack

In-process QC

IPQC

the die/tool inspection

• Every time when NG of semi-finished products;

• Every 10 minutes for pilot run or first sample.

Process QC
PQC

the inspection of  semi-finished products

• Every 30 minutes for stainless steel products;

• Every 2 hour for steel products.

Final QC

FQC

the examination for final products

• Every time before thermal/coating /passivation processes

• Every time after post manufacture before package